Evaluation the Effects of Hydroelectric Generation Units’ Start-Up and Shut-Down Cost on Hydro-Thermal Generation Scheduling Problem

Document Type : Original Article

Author

Department of Electrical Engineering, Shiraz Branch, Islamic Azad University, Shiraz, Iran

Abstract

One of the most important issues affects the generation scheduling problem is consideration of start-up and shut-down costs of generation units. The amount of consumed fuel by a thermal unit from starting up until synchronization with power grid has been considered as the start-up cost. However, for a hydroelectric generating unit, the start-up and shut-down costs have been neglected. Meanwhile, the degradation of equipment due to frequent start-up and shut-down actions for such units are considerable. In this paper, a fair methodology for estimation of these costs is provided and the effects of implementing these costs in the generation scheduling problem are studied by implementing a mixed-integer non-linear programming framework. The decision variables in this framework are determination of operating points of all generation units in the planning horizon. Also, determination of start-up and shut-down actions for such generating units are considered as control variables of the optimization problem. In order to evaluate the effectiveness of the proposed model, a typical hydro-thermal test system is accepted including 9 thermal units and one hydroelectric ones. Different scenarios are evaluated in this paper to assess the effects of start-up and shut-down costs in the short term planning. The simulation results confirmed that consideration of these costs can dramatically reduce the total start and stop actions.

Keywords

Main Subjects


Basu M (2010) Economic environmental dispatch of hydrothermal power system. Electrical Power and Energy Systems 32:711-720
U.S. Department of Energy, Western Area Power Administration and U.S. Department of the Interior, U.S. Bureau of Reclamation (2006) Replacements: Units, Service Lives
Power Resources Office (2012) Hydropower O&M costs from Increased wind generation: Task #1 Literature Search & Report
Chang G W, Aganagic M, Waight J G, Medina J, Burton T, Reeves S, Christoforidis M (2001) Experiences with mixed integer linear programming based approaches on short-term hydro scheduling. IEEE Trans. Power Syst., 16(4):743-749
CETAI (2016) Stator Winding insulation life expectancy and start/stop related aging. CEA Technologies Inc. (CEATI). Hydraulic Plant Life Interest Group (HPLIG)
Denver Federal Center, Technical Service Center (2009) Effects of duty cycle and stop/starts on hydropower. U.S. Department of the Interior
Delarue E, Cattrysse D, D'haeseleer W (2013) Enhanced priority list unit commitment method for power systems with a high share of renewables. Electric Power Systems Research 105:115-123
EPRI (2001a) Damage to powerplants due to cycling. California
EPRI (2001b) Hydropower technology roundup report: accommodating wear and tear effects on hydroelectric facilities operating to provide ancillary services: TR-113584-V4. California
Finardi E C, Silva E L d, Sagastizabal C (2005) Solving the unit commitment problem of hydropower plants via lagrangian relaxation and sequential quadratic programming. Computational & Applied Mathematics 24:317-342
Gorgizadeh S, Akbari Foroud A, Amirahmadi M (2012) Strategic  bidding  in  a  pool-based  electricity  market  under load forecast uncertainty. Iranian Journal of Electrical & Electronic Engineering 8(2):164-176
Helseth A, Gjelsvik A, Mo B, Linnet U (2013) A model for optimal scheduling of hydro thermal systems including pumped-storage and wind power. IET Generation, Transmission & Distribution 7(12):1426-1434
Iran Grid Management Company (IGMC) (2017) Generation units' start-up and shut-down cost executive regulatory. Iran Regulatory Entity (No. 207). Tehran, Iran (In Persian)
Javadi M S, Meskarbashi A, Azami R, Hematipour G, Javadinasab A (2011) Emission controlled security constrained unit commitment considering hydro-thermal generation units. International Review of Modeling and Simulation IREMOS 4(6):3243-3250
Kang C, Guo M, Wang J (2017) Short-term hydrothermal scheduling using a two-stage linear programming with special ordered sets method. Water Resources Management 31(11):3329-3341
Martin B, Deon M, Ron K, Larry K, Dave C, Tom R, Ron C, Janice B, Farrell W (1999) A method for calculating production costs for ancillary generation services. Paper presented at the Waterpower '99
McCalman K (2009) Mt. elbert start/stop costs and ongoing integration cost studies. Paper presented at the Slide presentation at the National Hydropower Association 2009 Annual Conference
Nezhad A E, Rahimi E (2014) Applying augmented ε-constraint approach and lexicographic optimization to solve multi-objective hydrothermal generation scheduling considering the impacts of pumped-storage units. International Journal of Electrical Power & Energy Systems 55:195-204
Nilsson O, Sjelvgren D (1997) Hydro unit start-up costs and their impact on the short term scheduling strategies of Swedish power producers. IEEE Trans. Power Syst., 12(1):38-44
Nourali Z, Mousavi S J, Shiri Gheidari S (2018) Optimization of multipurpose reservoir systems operation using cellular automata. Iran-Water Resources Research 14(1):80-91(In Persian)
Reza Norouzi M, Ahmadi A, Esmaeel Nezhad A, Ghaedi A (2014) Mixed integer programming of multi-objective security-constrained hydro/thermal unit commitment. Renewable and Sustainable Energy Reviews 29:911-923
Simab M, Javadi M S, Nezhad A E (2018) Multi-objective programming of pumped-hydro-thermal scheduling problem using normal boundary intersection and VIKOR. Energy 143(Supplement C):854-866
Wood A J, Wollenberg B F (1996) Power generation, operation and control. New York: John Wiley & Sons
Yuan L, Zhou J, Mai Z, Li Y (2017) Random fuzzy optimization model for short-term hydropower scheduling considering uncertainty of power load. Water Resources Management 31(9):2713-2728
Yuan X, Cao B, Yang B, Yuan Y (2008) Hydrothermal scheduling using chaotic hybrid differential evolution. Energy Conversion and Management 49(12):3627-3